Projects That Speak in Numbers

Case studies from highways, solar parks, smart cities, mines and farms — with the accuracy, timelines and outcomes our clients measure us by. Detailed datasets and downloads available on request under NDA.

142 km National Highway Corridor Survey — Startflying Solution case study

142 km National Highway Corridor Survey

RTK topographic survey, DTM and cross-sections for a greenfield expressway — delivered in 3 weeks.

  • Area142 km / 3,400 ac
  • Accuracy±3 cm
  • Timeline21 days
250 MW Solar Park Thermography — Startflying Solution case study

250 MW Solar Park Thermography

100% module-level thermal audit with geo-tagged defect register and loss estimation.

  • Modules612,000
  • Defects Found214 critical
  • Timeline6 days
Smart City 3D Digital Twin — Startflying Solution case study

Smart City 3D Digital Twin

LiDAR + photogrammetry city model for municipal planning and asset management.

  • Area18 sq km
  • Points1.2 B
  • DeliverableLOD-2 twin
Limestone Mine Volumetrics Program — Startflying Solution case study

Limestone Mine Volumetrics Program

Monthly pit surveys and stockpile reconciliation for statutory reporting.

  • FrequencyMonthly
  • Volume Accuracy±1.4%
  • Duration3 years
8,000-acre Precision Agri Program — Startflying Solution case study

8,000-acre Precision Agri Program

NDVI scouting, variable-rate zones and drone spraying for a producer cooperative.

  • Area8,000 ac
  • Water Saved~90% vs manual
  • Yield Uplift+11%
Captive Power Plant Inspection — Startflying Solution case study

Captive Power Plant Inspection

Chimney, cooling tower and conveyor-galleries visual & thermal inspection without shutdown.

  • DowntimeZero
  • Findings37 defects
  • Timeline2 days
Client Testimonials

What Project Owners Say

★★★★★

Startflying cut our corridor survey time from six weeks to eight days, and the accuracy report satisfied our most demanding design reviewers.

PK
Project DirectorNational Highway EPC Contractor
★★★★★

Their thermal inspection found 214 defective modules our ground team had missed. The defect register paid for itself in recovered generation within a month.

RS
O&M Head250 MW Solar Park, Rajasthan